Sentyl

Day 00 · InoculateEarly warning · 03 Guard

Sentyl. Batch-failure warnings hours before they become losses.

Single-signal alarms miss the slow, combined signs of a batch going wrong. Sentyl compares every batch with the path the twin expects and raises one warning, with a likely cause, while there is still time to act.

Sentyl · suite 2 · live

SEN-0311Lactate drift, B-2611day 8.5
CauseMetabolic shift after boluslikely
LeadBefore harvest assay5.5 days
NextReview feed, draft noteopen

Example One warning, illustrative.

Day 02 · LagCapabilities

What it does.

01

Twin residuals

Many signals compared with the twin’s expected path, not fixed limits.

02

Likely cause

Contamination, metabolic shift, foaming or sensor fault, ranked by likelihood.

03

Ranked actions

Suggested checks and corrections, for people to decide.

04

Deviation drafts

A first draft of the deviation note for QA review.

05

Sensor checks

Flags a drifting probe when the twin and the signal disagree.

06

Edge option

Runs beside the bioreactor on Jetson or IGX.

Day 04 · GrowthWarnings

A week of warnings, triaged.

  • SEN-0311Day 8.5 · B-2611Metabolic shiftLactate rising against the twin’s expected path while glucose is highopen
  • SEN-0314Day 4.2 · B-2614ContaminationOxygen uptake and pH diverge from twin; early contamination patternescalated
  • SEN-0317Day 6.8 · B-2602FoamAntifoam demand climbing faster than the expected profileacted
  • SEN-0320Day 2.1 · B-2615Sensor faultDissolved-oxygen probe drifting; twin estimate holds steadyclosed
  • SEN-0322Day 10.4 · B-2609Metabolic shiftAmmonia trajectory above the twin band; viability at riskopen
  • SEN-0325Day 7.3 · B-2611Sensor faultRaman glucose model and offline sample disagree by more than its bandacted

Example A week of Sentyl warnings across one suite. Batch IDs, days and findings are made up.

Day 06 · GrowthHow it works

One run, start to finish.

  1. 01Weeks 1–2

    Learn

    Normal behaviour from past batches and the twin.

  2. 02Weeks 3–6

    Shadow

    Warnings logged but not sent.

  3. 03Week 7

    Tune

    Your team sets limits and routing.

  4. 04Ongoing

    Live

    Warnings reach the right people.

  5. 05Per warning

    Learn again

    Every confirmed or dismissed warning trains the next.

Day 08 · ProductionSpecification

The details.

Sentyl specification (draft)
ItemDetail
SignalsProcess time series, PAT spectra, off-gas, assays; reactor video planned
MethodMultivariate residuals against the Kinetyx twin
CausesContamination, metabolic shift, foam, sensor fault; more per modality
LatencyMinutes from data to warning (design target)
RecordsWarnings, triage and outcomes recorded
Runs onRAPIDS, Holoscan, TensorRT; Metropolis for video (planned)

Day 10 · ProductionIn the loop

Where it sits.

  1. KinetyxTwin
  2. TiteraPrediction
  3. SentylEarly warning
  4. FeedraControl
  5. ScalyxScale-up
  6. BioqoreAPI and edge

Every harvested batch and its assaysrecalibrate the Kinetyx twin

Sentyl uses the expected path from Kinetyx and the forecasts from Titera. Feedra stays inside the safe envelope that Sentyl watches.

Day 12 · Late productionQuestions

Straight answers.

Will it flood us with alarms?

It is tuned in shadow mode first, and every warning is triaged, so dismissed warnings make the next ones better.

Can it stop a batch?

No. It warns and drafts. People decide, under your procedures.

Does it need cameras?

No. Video for foam and turbidity is a planned option.

Day 14 · HarvestNext step

Bring one process. We will twin it.

Share the batch records and PAT data from one process you run today. We calibrate a twin of it, forecast your next runs before they finish, and show you where yield and quality are being left in the vessel.