Day 00 · InoculateHow it works
From your batch history to a twin you trust.
We start with one process and the batches you have already run, so every forecast has a baseline. Nothing reaches the floor until your team says so.
Day 02 · LagProcess
Five steps, about twelve weeks.
01Weeks 1–2
Connect
Install on your GPU servers or a dedicated cloud. Read historian, PAT and assay data for one process.
02Weeks 3–5
Calibrate
Kinetyx fits a hybrid twin to twenty or more past batches and reports where it is weak.
03Weeks 6–9
Shadow
Titera forecasts live batches; your team scores them against the assays.
04Weeks 8–10
Warn
Sentyl watches each batch against the twin’s expected path.
05Weeks 10–12
Improve
Feedra proposes feed and condition changes for the next runs.
Day 05 · GrowthResponsibilities
Who does what.
| Step | Your team | Fermwise |
|---|---|---|
| Connect | Grants read access to historian, PAT and assay data for one process | Installs on your servers; maps tags and batch phases |
| Calibrate | Shares process knowledge and past deviations | Fits the Kinetyx twin; reports its error per variable |
| Shadow | Compares forecasts with assays; owns the verdict | Forecasts live batches; logs every forecast |
| Warn | Sets warning limits; triages each warning | Flags drift against the twin; drafts deviation notes |
| Improve | Approves or rejects each proposed change | Proposes feeds and conditions inside your limits |
Day 07 · ProductionCopilot
Ask the batch why.
Process engineers ask in plain language.
The process copilot answers from batch data, the twin and open warnings, cites what it used, and drafts summaries for review. It never changes a setpoint or a record on its own.
Process copilot · example
Why is B-2611 forecast 0.4 g/L under B-2604?
Two drivers explain most of it. Lactate began rising on day 8, about 1.2 g/L above the twin’s expected path, after glucose stayed above 5 g/L for two days following the day-7 bolus. Viability is also falling faster than B-2604 from day 9. Sentyl warning SEN-0311 covers the lactate drift. Want me to draft the deviation summary for QA review, or run Feedra on the remaining feeds?
Illustrative. The copilot cites batch data and warnings; it drafts, and people approve.
Day 09 · ProductionOutcomes
What you have at the end.
Twin
A calibrated twin
Of one process, with its error on every variable you care about.
Evidence
A forecast record
Every live forecast next to the assay result, scored by your team.
Choice
A decision
Adopt for the next campaign, extend to another process, or stop. Each is a fine outcome.
Day 12 · Late productionQuestions
Straight answers.
How many past batches do you need?
Twenty or more of one process is a good start. Fewer can work with strong process knowledge; we will tell you what the twin can and cannot do with what you have.
How much of our team’s time does this take?
Plan for a process engineer part-time throughout, a data or automation contact in the first two weeks, and quality review at each step.
Do we need new hardware?
Not necessarily. A small GPU server or dedicated cloud capacity covers one process. Edge units are optional.
Day 14 · HarvestNext step
Bring one process. We will twin it.
Share the batch records and PAT data from one process you run today. We calibrate a twin of it, forecast your next runs before they finish, and show you where yield and quality are being left in the vessel.